Dream turned Into Reality.
My first visit to Chittaranjan
Locomotive Works.
TRIP REPORT PRESENTED BY:
It was the 1st of April, 2013. 7 years I
have been dreaming that someday I will visit Chittaranjan Locomotive Works and
the day finally had come.
Took a train from Belur to Howrah. Boarded
the Black Diamond Express.
Me
including two friends Soni Sengupta and Tanmoy Mondal took a glance of the Locomotive
that was hauling the Black Diamond Express. It was my favourite WAP-7 (30295).
The train stopped for half an hour before
Shaktigarh station.
Ranchi Shatabdi Express was made to
pass since it was running late. Reached Asansol at 10.15am. Took a bus from
Asansol’s bus stand to Chittaranjan. As we were going we spotted Poorva express
racing right beside us hauled by a WAP 4. As we approached Chittaranjan, saw a
gate where it was written “Welcome to
Chittaranjan Locomotive Works, STOP PLEASE SHOW YOUR PERMIT”.
After that we
came across a statue and on top it hung a big poster of 3 WAG 9’s being
manufactured. Then we got down at Children’s Park at Chittaranjan.
My Dad’s
friend was waiting for us.
He
took us to an auto stand where 3 of us boarded an auto. Saw 2 Loco’s kept at
the Loco Park beside the auto Stand, most probably it was WAG 5 Loco’s. Finally
we reached the Factory.
My
heart skipped a beat. 7 years I have been waiting for this day to come and it
finally came. My dad’s friend brought the GATE PASS in which our names were
mentioned.
Beside
the main factory gate was an RPF office where two RPF verified and checked our
gate pass and allowed us to go inside. We entered the factory.
The
Engineers out there call them as workshops. Since it was 11.40am, several
workshops have been closed. I came to know that duty hours in the factory is
from 6am to 12pm. As we were walking we saw several cow catchers, roof hatch
equipment of locos were kept outside.
Entered a workshop. Words cannot be expressed to define the size
of the workshop.
We saw shells
of WAP 7, WAG 9, WAG 7, WAP 4 kept.
A mechanical
engineer was with us who was showing the various workshops and its content.
Couldn’t find
any new locomotives. All 20 new loco’s had been comissioned the day before from
the factory. Then we moved from one
workshop to the other. It had a new WAG 9, a WAP 7(30359).
Found a new
feature in WAP 7 but the engineer couldn’t explain properly since it was
related to electrical. The new WAP 7(30359) had no points above the cow catcher
for HOG as the previous ones had. The Engineer told me that feature had been
incorporated in a plug sort of pointer kept in the middle of the two locks for
the multiple unit function of the WAP 7. Couldn’t explain that feature anymore.
Then we saw
few Transformers kept and a lot of Electric components such as the harmonic
filter, the GTO thyristor. New WAP 7’s and WAG 9’s use IGBT instead of GTO
Thyristor’s.
As we moved
further to another worshop we saw an old WAP
5(30055) marked BRC was lying. It was told that the engine had faced
serious issues and couldn’t be maintained properly and engineers in Ghaziabad
shed couldn’t sort out the problem so it had been sent back to the factory to
find and solve the issue.
Next we
visited the Motor workshop. We saw 100’s of DC Series motor meant for
conventional Locomotives such as WAP 4 was lying inside and 100’s were being
made. The workshop was as huge as the previous one. We came across squirrel
cage induction motor being made. But there was no one to explain us how it
works and its features because it was already 1pm and there were no engineers
or workers in the factory.
We came out
the motor shop and then we visited the wheel workshop. We saw a huge electonic
Lathe machine designed to make axle’s of wheels.
But
unfortunately it was 2pm and we had to move out of the factory because in the
gate pass it was mentioned that we were allowed till 12.15pm.
Anyhow it was a great and amazing experience.
I told my dad’s friend that I will be visiting CLW once again during the month
of July because my thirst for knowledge of Locomotive’s haven’t been satisfied
yet. He promised me he would make that permission once again.
At 3pm we
boarded a bus after having Lunch at a restaurant near Kendriya Vidyalaya School
named “Sonali”.
We reached
Asansol station at 4.30pm. The Black Diamond Express came at platform no 6.
We reached
Howrah at 10pm. Took a snap of the engine which was pulling the train. It was
the same Engine WAP 7(30295).
Thus ends
one of the most memorable moments of my life.
Some snapshots of CLW.
A WAG 7 Loco
getting prepared for the piping connections to be made.
Transformers
of 3 Phase Loco’s kept to be installed in 3 Phase Loco’s.
Asia’s
Longest Bay. The Fabrication Shop. 3.5kms.
Note: Please refer GP 140 article's to know the entire history of 3 Phase Locomotives in India.